Key takeaways
- Private credit is now core infrastructure. Direct lending has moved from the edge of mid-market finance to the centre of it, and the largest managers now compete on certainty, speed and relationship depth rather than simply on price.
- Floating-rate debt moves the interest-rate decision onto the borrower. Coverage, liquidity and covenant headroom matter more than a headline leverage multiple that ignores the cost of the next twelve months.
- Adjusted EBITDA is a negotiating document, not a fact. Add-backs, run-rate synergies and under-invested capex can make a balance sheet look stronger than its cash flow will prove to be.
- Capital allocation is a gate process, not a single approval. The strongest industrial borrowers stage capital, test returns through a downturn and retain the option to stop.
- The 2026–2028 refinancing cycle will reward preparation. Borrowers who understand lender concentration, prepayment economics and covenant tests before they need money will negotiate from strength.
Private credit has spent the past decade becoming ordinary. What began as a specialist answer for companies too small, too complex or too urgent for the syndicated loan market is now a standing allocation for insurers, pensions and sovereign funds. Industry estimates put the global private credit market at roughly $1.7 trillion, with direct lending to mid-market companies forming its largest single block. The number is less important than the implication: capital is no longer scarce for a credible borrower with a defensible business. The scarce resource is discipline.
That shift changes the question a chief financial officer should ask. It is no longer “can we get the loan?” It is “what does this loan commit the balance sheet to, and what will we wish we had negotiated when the cycle turns?” The same question applies to the private credit manager on the other side of the table. A portfolio built on aggressive add-backs and thin covenants can look healthy in a growing economy and fragile in a flat one.
The new architecture of corporate funding
The retreat of banks from holding mid-market credit did not happen in a single moment. Capital rules, stress-testing and the economics of balance-sheet lending made it rational for banks to originate and distribute rather than hold. Private credit funds filled the gap, but they did so with a different model: they underwrite with their own capital, hold the loan, and negotiate directly with the borrower.
From relationship banking to private mandates
The practical consequence is a concentration of credit judgement. A borrower may deal with one or two private lenders rather than a syndicate of twenty banks. That can be an advantage. Decisions are faster, waivers are easier to obtain and the lender has a direct interest in the company's survival. It can also be a vulnerability. If the lender's own portfolio hits a redemption wall or a sector limit, the borrower's access to fresh capital can narrow quickly.
Borrowers should therefore treat lender composition as a balance-sheet risk, not a procurement detail. A single lender with a concentrated position, a fund nearing the end of its investment period and a lender with a strong presence in the company's cyclical sector are three different counterparties, even if their term sheets look similar.
What the shift changes for borrowers
Private credit typically prices at a spread over a floating reference rate, with an original issue discount, an upfront fee and a package of covenants. The all-in cost is rarely the lowest available. Borrowers pay for certainty, speed and flexibility. The question is whether those benefits are worth the explicit and implicit costs over the life of the facility.
| Channel | Speed and certainty | Pricing | Covenants and disclosure | Best used for |
|---|---|---|---|---|
| Bank term loan | Moderate; credit committee and syndication | Often lowest headline margin | Maintenance covenants; regular reporting | Stable cash flows, existing banking relationships |
| Private credit | High; bilateral negotiation | Higher spread, fees and discount | Negotiated; often tighter information rights | Refinancing, acquisitions, growth capex, complexity |
| Public bonds | Lower; market windows and ratings | Market-determined | Light covenants; public disclosure | Large, rated issuers with predictable cash flow |
| Equipment finance | High for standard assets | Asset-specific | Asset security; limited corporate covenants | Identifiable machinery with a resale market |
The table is a simplification, but it makes the trade-off visible. A borrower who chooses private credit for speed should not then be surprised by information rights or a prepayment premium. Those are the price of the bargain. The mistake is to compare only the margin and ignore the operational cost of the relationship.
Reading a balance sheet in a floating-rate world
Leverage multiples are a useful shorthand and a poor decision tool. Two companies can both report four times debt to EBITDA and have very different ability to survive a 200 basis point increase in their cost of debt. The difference sits in coverage, liquidity and the quality of the cash flow that supports the multiple.
Coverage before leverage
Interest coverage — EBITDA divided by cash interest — is the first number to stress. A company at 2.5 times coverage has limited room for a rate reset, a margin squeeze or a delayed contract. A company at 1.6 times coverage is already making a choice between capex, dividends and survival. Fixed-charge coverage, which includes lease payments and scheduled amortisation, is more demanding and more honest.
Run the arithmetic at the actual reset date, not at today's rate. If the facility resets quarterly, model a 100, 200 and 300 basis point increase and ask what happens to the covenant. If the answer requires a waiver, the capital structure is already a negotiation.
The add-back problem
Adjusted EBITDA has become the centre of gravity in private credit underwriting, and for good reason: a growing company may have genuine one-off costs. But the definition can stretch. Run-rate synergies from an acquisition that has not closed, cost savings that require capex, share-based compensation that will be paid again next year, and “normalised” maintenance capex below actual spend all flatter the denominator.
A practical test is to rebuild the metric from the cash-flow statement. Start with reported EBITDA, subtract recurring costs that were labelled exceptional, add back only savings that are already in the run rate, and compare maintenance capex with depreciation. If the adjusted figure depends on a narrative rather than a ledger, treat it as a negotiating position.
KNSA note
A covenant that is set on adjusted EBITDA is only as strong as the definition. Ask for the calculation schedule, the historical add-back bridge and a sensitivity showing leverage under the lender's base case and a downside case. If the schedule cannot be produced quickly, the quality of the reporting is part of the credit risk.
Working capital is the tell
Industrial businesses often fail through working capital before they fail through the income statement. Receivables stretch, inventory accumulates and payables compress at exactly the moment the company needs flexibility. Cash conversion — the number of days between paying suppliers and collecting from customers — deserves a line in every board pack. A business that reports stable EBITDA but a deteriorating cash conversion cycle is borrowing tomorrow's liquidity to pay for today's growth.
Capital allocation at the industrial asset level
At the corporate level, capital allocation is a story about priorities. At the asset level, it is a series of decisions about specific machines, plants, routes and contracts. The two levels frequently diverge. A board can approve a “strategic” programme that individual sites cannot justify at the hurdle rate, and a site can generate excellent returns on a project that does not fit the corporate strategy.
Hurdle rates and the cost of patience
The hurdle rate should reflect the fully loaded cost of capital, not the cost of the last facility. Add the spread, fees, hedging costs and the tax shield, then add a risk premium for the project's execution and cyclicality. A project that clears a 12% hurdle in a stable regulated business may not clear the same hurdle in a commodity cycle. The discount rate is a management judgement, and it should be written down before the spreadsheet is built.
Staging is the most underused form of discipline. A project that can be built in phases, with a stop-go decision between each phase, preserves optionality and reduces the cost of being wrong. The alternative — approving the full programme to capture a theoretical scale benefit — concentrates the risk at the point of maximum uncertainty.
A four-gate allocation test
Before capital is committed, the proposal should pass four gates. The gates are deliberately sequential: a failure at any one should stop the process rather than be averaged into a composite score.
- Strategic fit: Does the asset strengthen a position we intend to hold for at least a decade?
- Through-cycle return: Does the project clear the hurdle rate in a downside case, not only the base case?
- Balance-sheet resilience: Can we fund it without breaching covenants or losing liquidity in a stress scenario?
- Executable governance: Do we have the people, permits and operating capability to deliver it on time?
- Exit optionality: If the thesis changes, can we stop, sell or repurpose the asset?
- Incentive alignment: Are the managers who approve the spend also accountable for the return?
“The most expensive capital is not the loan with the highest spread. It is the capital committed to a project that cannot be stopped.”
KNSA Editorial Desk
The 2026–2028 refinancing question
A significant volume of private credit raised during the low-rate years will approach its maturity or its non-call period over the next three years. The precise size of the wall is debated, but the direction is not: borrowers who assumed they could simply extend on the same terms will discover that lender appetite has become more selective.
Refinancing is not a single event. It is a sequence of choices about lender selection, timing, covenant resets, prepayment economics and the amount of equity the sponsor is willing to inject. Borrowers who begin the conversation twelve to eighteen months before maturity have more options than those who begin six months before. The early conversation is not a sign of weakness; it is a form of price discovery.
Covenant headroom as strategic optionality
A covenant is not only a lender protection. It is a constraint on management's ability to respond to a shock. A company with 30% headroom can acquire a distressed competitor, absorb a customer loss or accelerate maintenance capex. A company with 5% headroom must ask permission for every decision. The value of headroom is highest when the economy is least cooperative.
When negotiating, borrowers should model the covenant at the downside case and at the end of the facility's life, not only at closing. If the covenant is tested quarterly on a trailing twelve-month basis, a seasonal business should test it at the seasonal low point. If the covenant includes a capex carve-out, the borrower should confirm that the carve-out survives a change of control.
Governance, disclosure and the price of opacity
Private credit is a private market, but it is not an unaccountable one. Lenders typically negotiate information rights: monthly management accounts, quarterly covenant certificates, annual audited statements and, in some cases, board observation. Those rights exist because the lender is holding concentrated risk and cannot sell it quickly.
For the borrower, the quality of disclosure is a strategic asset. A company that provides clean, consistent reporting builds credibility and can negotiate better terms when it needs a waiver. A company that surprises its lender with bad news pays for the surprise in fees, tighter covenants and lost flexibility. The same principle applies to sponsors: a credible sponsor with a clear playbook can obtain more patient capital than one that treats every negotiation as a zero-sum game.
Conflicts should be identified before they become disputes. Management fees, monitoring fees, transaction fees and affiliate arrangements can all create incentives that diverge from the borrower's interests. Independent directors and a clear related-party policy are not bureaucratic luxuries; they are part of the cost of operating with private capital.
A practical checklist for CFOs and sponsors
The following checklist is designed for the period before a refinancing, acquisition or major capex programme. It is not a substitute for legal or financial advice, but it is a useful way to expose the questions that tend to be deferred until they are expensive.
- Rebuild adjusted EBITDA from the cash-flow statement and document every add-back.
- Stress interest coverage at +100, +200 and +300 basis points on the actual reset dates.
- Model liquidity runway for at least eighteen months under a downside case.
- Map lender concentration, fund maturity and sector exposure across the capital structure.
- Calculate covenant headroom at the seasonal low point, not only at year-end.
- Price the prepayment premium and the cost of switching lenders before comparing offers.
- Stage major capex and define the stop-go criteria in advance.
- Confirm that information rights and reporting obligations are operationally deliverable.
- Identify related-party fees and conflicts before the lender does.
- Prepare a one-page refinancing narrative that a new lender can underwrite quickly.
Frequently asked questions
Is private credit more expensive than a bank loan?
Usually, on an all-in basis. The spread, original issue discount, upfront fees and covenant package can add several hundred basis points to the effective cost. The relevant comparison is not the margin alone but the total cost of certainty, speed and flexibility over the life of the facility.
What leverage is safe for an industrial borrower?
There is no universal number. A business with contracted revenue, low maintenance capex and strong liquidity can carry more debt than a cyclical manufacturer with concentrated customers. The safer test is coverage and liquidity through a downside case, not a leverage multiple in the base case.
How should a CFO prepare for a 2027 refinancing?
Start twelve to eighteen months early. Rebuild the EBITDA bridge, stress-test covenants, map the lender universe, and prepare a concise narrative that explains the business through a cycle. Early preparation converts a forced refinancing into a negotiated one.
Does private credit reduce bank relationship risk?
It changes it. A bilateral lender can move faster and may be more constructive in a workout, but the borrower is more exposed to that lender's portfolio constraints. Diversifying across lenders and instruments remains a basic risk control.